From the booster unit wiring is very simple to the track. Using at least 16AWG wire only two wires are needed. Run these two heavier gauge wires around the layout dropping feeder wires to the track every 6'-10'. These feeder wires can be smaller, such as 20AWG wire.
Email to sales@nscalesupply.com
Back To Main Page
© Copyright 1997 by Solution Development, Inc.